Congratulations! Your site survey is complete. With the photos/ measurements of your roof, electrical system, and structural integrity, we’re now making sure we can fit the proposed system on your house. These are the steps we take to assure you, that we have the perfect design:


  1. Our CAD engineers design your panel layout and electrical system.
  2. Investigation of any problems
  3. Review design

This whole process only takes 1 business day!
Now that all steps are complete and the design has passed the initial go around. The design is sent out to receive the structural engineering letter that is needed to submit for permitting.